| IP-2 (1905, 1906) | ![]() Back |
![]() Up |
![]() Next |
| The IP-2 meter combined the two halves of the IP into one unit - the Type I meter and the Form 3 prepayment device. As with the combined version of the Fort Wayne K prepayment meter, the prepayment device was operated by the meter register instead of a contact device and coil as in the Type IP. | ![]() GE prepayment meter pamphlet |
||